Monitoring the following in day to day operations
1) Production Planning according to annual Budget
2) Operating parameters such as fuel ratio’s in KILN and PC, Pyro profile.
3) Raw mix requirements and optimisation in order to maintain critical quality parameters such as LSF, A/F, with Pet Coke firing.
4) Raw mix and coal mix design based on minerology of the plant location
5) Optimising the fuel cost based on thermie values and also designing the raw mix in order to control raw mix cost.
6) Refractory management (Planning, procuring, and installations).Good knowledge about refractory materials and their installations by using DAT appratus, Brokk machine, and manual application too. In one of the green field project 5000 MT of refractory was installed. Taking care of Refractory mattters for the entire group of plants(Both Kalburgi an Kadapa units)
7) Responsible for the AF materials consumption in order to enhance the TSR as maximum as possible,up to 30%. Following the CPCB/SPCB norms for the usage of AF materials (Hazardous and Non- Hazardous). Taking care for both the plants in India.
8) Operation of WHRS(Waste Heat Recovery System) and able to produce 6.5-7.0 MWH according to its installation capacity
9) Man Power Management
10) Power Management . Based on analysis, corrective actions will be taken accordingly
11) Maintainig the Safety procedures during operation, shut down and also while using Alternative fuels
12) Working with a goal of ZERO accident